张石磊,段庆伟,张雪东,宋建正,唐智钢.堰塞体溃决离心模型试验供水系统关键技术研究[J].中国水利水电科学研究院学报,2023,21(2):166-174
堰塞体溃决离心模型试验供水系统关键技术研究
Study on key technology of water supply system in centrifugal model test of damming body breaking
投稿时间:2022-05-20  
DOI:10.13244/j.cnki.jiwhr.20220222
中文关键词:  堰塞体溃决  离心模型试验  供水系统  常水头控制  竖井式溢流口  环形水箱
英文关键词:damming body break  centrifugal model test  water supply system  constant head control  shaft overflow outlet  ring-shaped water tank
基金项目:国家重点研发计划项目(2017YFC1501103)
作者单位E-mail
张石磊 中国水利水电科学研究院, 北京 100048
内蒙古引绰济辽供水有限责任公司, 内蒙古 兴安盟 137400 
 
段庆伟 中国水利水电科学研究院, 北京 100048 duanqw@iwhr.com 
张雪东 中国水利水电科学研究院, 北京 100048  
宋建正 中国水利水电科学研究院, 北京 100048  
唐智钢 中国水利水电科学研究院, 北京 100048  
摘要点击次数: 277
全文下载次数: 459
中文摘要:
      堰塞体溃决洪水洪峰流量及洪水时程曲线特征的预测是堰塞湖应急抢险及下游风险控制方案制订的重要依据。堰塞体溃决的离心模型试验,在研究堰塞体溃决机理、溃决过程及溃决洪水的历时曲线特征方面独具优势,但离心模型试验供水系统的设计,涉及到从外部静止状态到高速旋转状态的模型中连续供水,同时还要保证堰塞体溃决过程中上游水位为设定的常水头,是堰塞体溃决离心模型试验中的关键性的一大难题。本文围绕以上难题,设计了一种环形水箱以解决从静态到动态模型的连续供水问题,通过理论分析,确定了环形水箱中可提前注入的最大水量。另外在试验箱设置了竖井式溢流口,可以排出高出设定常水头的水体,保证了上游水位的稳定。通过以上设计有效地解决了供水系统中的关键难题,并在后续堰塞体溃决离心模型试验中得到了验证。
英文摘要:
      The prediction of flood peak flow and flood time-history curve of damming body breaking is an important basis for the formulation of emergency rescue and downstream risk control plan.The centrifugal model test has unique advantages in studying the mechanism, process and flood time-history curve characteristics of damming body breaking.However, the design of the water supply system in the centrifugal model test involves continuous water supply from the external static state to the high-speed rotating state and maintaining of the upstream water level in the process of the damming body breaking, which is a key problem in the centrifugal model test.In this study, a ring-shaped water tank was designed to ensure the continuous water supply from static to dynamic state.The maximum water volume that can be injected to the water tank was determined through theoretical analysis.In addition, a shaft overflow outlet was set in the test chamber to discharge the redundant water higher than the constant head and ensure the stability of the upstream water level.The above design effectively solved the key problems of water supply system in the centrifugal model test of damming body breaking and ensured the successful completion of subsequent tests.
查看全文  查看/发表评论  下载PDF阅读器
关闭