梁希林,刘枫.双沟水电站面板堆石坝变形反演分析[J].中国水利水电科学研究院学报,2019,17(6):423-431 |
双沟水电站面板堆石坝变形反演分析 |
Deformation back analysis of the concrete panel rockfill dam of Shuanggou Hydropower Station |
投稿时间:2019-02-28 |
DOI:10.13244/j.cnki.jiwhr.2019.06.004 |
中文关键词: 混凝土面板堆石坝 变形 有限元计算 反演分析 预测 |
英文关键词:concrete panel rockfill dam deformation finite element calculation back analysis prediction |
基金项目: |
|
摘要点击次数: 753 |
全文下载次数: 872 |
中文摘要: |
利用反演预测模型,结合混凝土面板堆石坝原型观测资料,对大坝填筑料的邓肯E-B模型参数进行反演分析,并用反演所得的坝体材料参数及其实际填筑过程进行有限元计算,得到坝体及面板的变形值;利用模型对水库蓄水三年后的变形值进行计算;根据实际监测结果与计算值进行对比,证明了有限元计算结果的合理性。 |
英文摘要: |
Back analysis of the Duncan EB model's parameters of material building in dam is carried out by using inversion prediction model and prototype observation data of the concrete face rockfill dam. Deformation values of dam and face plate are obtained by FEM analysis using the parameters of dam material, considering its actual filling process. Then the model is used to predict deformation values after three years of reservoir impounding. According to comparisons between monitoring results and predicted values, the rationality of the finite element calculation results and the effect on construction and operation management are both analyzed. |